Skip to content. | Skip to navigation

Equipment for Quality Control and R&D+i

NEURTEK services

Own Technical Assistance Service 48h. Calibration Laboratory accredited by ENAC ISO-17025 in Optics, Temperature, Humidity and Viscosity. Service and Maintenance Contracts. Spare parts in stock.

NEURTEK SERVICES Equipo

T. +34 943 82 00 82 | sat@neurtek.com

Monday to Friday: 8:00 am to 17:30 pm

 


SAT48H

OWN TECHNICAL ASSISTANCE SERVICE

Specialized, efficient and competent technical service, with excellent training in electronics, mechanics, software, etc. With great knowledge in applications.

A professional service available at all times in order to provide cooperative and reliable assistance.

 


ENAC ILAC

ENAC ACCREDITED CALIBRATION LABORATORY

NEURTEK SERVICES is a Calibration Laboratory accredited by ENAC (Entidad Nacional de Acreditación, an entity recognized by ILAC; according to UNE EN ISO/IEC 17025 for:

> Optics Color, Gloss and Lighting
Colorimeters, reflection spectrophotometers and multiangle, color standards, glossmeters, lighting booths and rooms.

> Temperature and Humidity
Temperature, Relative Humidity and Isothermal characterization.
Thermometers, Temperature indicators, Isothermal systems (heater, ovens, refrigerated cabinets, etc.), Autoclaves, Climatic chamber and Thermo-hygrometers.

> Viscosity
Viscosity cups. 


NEURTEK SERVICES acreditation Nº 270/LC10.244

We calibrate instruments of all brands and models.

NEURTEK offers a comprehensive calibration service for which it has a collaboration agreement with reference laboratories for the following references: abrasión, hardness, thickness, adherence...

 


Mantenimiento

SERVICE AND MAINTENANCE CONTRACTS

Preserves the high quality characteristics and maximum reliability of the equipment involved in the production and control process with periodic maintenance and care to restore the predetermined operating conditions. Prevents service costs.

 


RECAMBIOS

SPARE PARTS

We have Original Spare Parts.

We anticipate our customers' needs in terms of spare parts management.

With the goal of putting the installation back into operation as soon as possible.